MINE WATER · DRAINAGE · ENVIRONMENTAL CIVILS
Engineer the water before it becomes the liability.
Big Three integrates water, civil and construction capability around mine-affected water, runoff, erosion, pumping, containment and treatment-support infrastructure.
THE PROBLEM
Water often links operating risk, closure liability and environmental performance. Our role is to convert that problem into physical infrastructure and executable work packages.
SCOPE
What this can include.
Final scope depends on site conditions, professional requirements, client procurement strategy and the specialist disciplines required.
- Mine stormwater and clean/dirty water separation support
- Channels, berms, culverts and erosion protection
- Ponds, containment and attenuation infrastructure
- Pump stations, pipelines and conveyance works
- Mine-water treatment enabling civils
- AMD-related infrastructure support with specialist partners
- Drainage rehabilitation around dumps and disturbed land
- Hydraulic and civil constructability coordination
- Quantities, tender packages and construction cost control
- Inspection, evidence and asset handover records
A PRACTICAL FIRST ENGAGEMENT
Mine Water Recovery Scope
Assess the water path, identify critical civil failures and define priority drainage, pumping, containment and treatment-support work packages for procurement or execution.
Field baseline
Condition, constraints, evidence and priority risks.
Engineering response
Options, interfaces, constructability and technical scope.
Commercial package
Quantities, cost logic, procurement and work packaging.
Delivery evidence
Programme, quality, progress, close-out and asset record.
RELATED SOLUTIONS
Problems rarely respect discipline boundaries.
Move across the connected issues around the asset rather than treating each workstream as a separate problem.
Start with the problem on site.
Send the location, asset, known issue and any available drawings, reports or tender information.
